Extension of the Mining Hospital in Karviná


A modular extension of the Mining Hospital in Karviná from 77 modules.

Classification:Healthcare projects / Hospitals
Year of implementation:2020
Client:Karvinská hornická nemocnice
Country of implementation:Czech Republic
Technical Specifications: Length of assembly: 3 months
Length of manufacture: 2 months
Number of modules: 77
Area: 1960 m2
Product series: ComfortLine
Sales model:Sale

After experience with hospital buildings abroad, KOMA has implemented its first hospital edifice in the Czech Republic. The inves­tor chose modular construction mainly due to the rapid assembly benefits. A three-floor extension of the Mining Hospital in Karviná was completed within a few months. In February last year, a study was finalised and this was followed by preparatory work and the processing of necessary permits. The production of the first modules began in August, after which assembly was completed. As of 5 January, patients began making use of the emergency and outpatient facilities on the ground floor of this building. The first floor is intended for after-care, but it is currently being used as a COVID-19 ward. There is an orthopaedic ward on the second floor with 18 standard beds and 4 beds designated for intensive care. The delivery included an elevator, hot water heating, and air-conditioning.